1997 Annual Report

Seright, R.S.: "Improved Methods for Water Shutoff," annual report (DOE/PC/91008-4), Prime Contract No. DE-AC22-94PC91008, Subcontract No. G4S60330, BDM-OKLAHOMA/U.S. DOE (Sept. 1997).

 
Title Page   Abstract   Table of Contents  Acknowledgments   Executive Summary   
 
Chapter 1: Introduction
 
Chapter 2: Using Water/Oil Ratios to Diagnose Excessive Water Production Mechanisms
 
Chapter 3: Sizing Gelant Treatments in Hydraulically Fractured Production Wells
 
Chapter 4: The Potential of Gel Treatments for Reducing Channeling through Naturally Fractured Reservoirs
 
Chapter 5: Gel Properties in Fractures
 
Chapter 6: Disproportionate Permeability Reduction
 
Nomenclature & References
 
Appendix A:Data and Figure Supplement for Chapter 2
 
Appendix B:Derivation Supplement to Chapter 3
 
Appendix C: Fortran Program for Finding Pressures, Flow Rates, and Front Positions During a Unit-Mobility Displacement in a Simple Naturally Fractured Reservoir. Dispersion Not Included.
 
Appendix D: Fortran Program for Finding Pressures, Flow Rates, and Front Positions During a Unit-Mobility Displacement in a Simple Naturally Fractured Reservoir. Dispersion included at the Rear but not the Front of the Tracer Bank.
 
Appendix E: Fortran Program for Finding Pressures, Flow Rates, and Front Positions During a Unit-Mobility Displacement in a Simple Naturally Fractured Reservoir. Dispersion included at Both the Front and Rear of the Tracer Bank.
 
Appendix F: Derivation of Eq. 55 in Chapter 5
 
Appendix G: Data Supplement for Chapter 6
 
Appendix H: Technology Transfer